Answer first
In power tools private label, a useful quote is not “the lowest number.” It is a written package: what is included, what is excluded, sample vs mass-production lead time (usually in weeks), packing, and how price moves if size, Ah, or cert path changes. KaimaLabel quotes after a PL brief — we do not publish a fixed price list, because tier, market, and mix change the number.
→ Start a brief: WhatsApp · PL brief · Browse consumables & blades
Lead time — how to talk about it honestly
| Stage | What “lead time” usually covers | How we state it |
|---|---|---|
| Sample | Make / prepare sample after brief lock | Measured in weeks, written per SKU |
| Packaging freeze | Artwork + carton/sleeve confirm | Often overlaps sample; do not print full brand pack before function OK when possible |
| Mass production | After deposit / PO terms + frozen BOM | Weeks, depends on line load and mix |
| Re-order | Same BOM / version | Often shorter than first PO if stock plan exists — still confirm in writing |
We do not promise calendar dates on a marketing page. Dates belong in the project email/WhatsApp after SKUs are locked.
What stretches timelines
- Many machine models in one first PO (we recommend lean tools + deep consumables)
- Unclear cert path (“need UL” with no scope)
- Packaging languages and barcodes late
- Silent BOM changes between sample and bulk
Related: Sample vs bulk QC · First-order consumables mix
How to read a PL quote (checklist)
Ask that every quote line answers:
- What SKU / family (e.g. C5 metal disc size, T1 kit config)
- Unit of price (FOB / EXW / other — as agreed in writing)
- What is included (tool only? battery? charger? sleeve? carton? manual?)
- MOQ and price break if any
- Sample fee / deductible rules
- Lead time band (sample + bulk, in weeks)
- Cert status for this SKU: ready / in progress / can start
- Validity of the quote (how many days)
If a quote is only a single number with no packing list, treat it as incomplete.
Price vs total risk
| Cheap unit price | Often hides |
|---|---|
| Lowest sample | Different bulk cells / plastics |
| No spare-parts line | Aftersales cost later |
| “UL ready” with no file | Compliance risk (esp. USA) |
Total cost includes QC misses, rework, and dead stock — not only the factory sticker price.
See: Factory vs PL partner
What to send before we quote
Market · channel · price tier · families/SKUs · sizes/pack qty · qty range · cert/language needs · company
Use the site WhatsApp · PL brief or email kaimazjw@gmail.com.
FAQ
Can you give a price without a brief?
Not a reliable one. Tier, size, and pack change the number.
Why “weeks” instead of exact dates on the website?
Because line load and SKU mix change. Exact dates belong in the project thread after lock.
Do consumables ship faster than tools?
Often the cycle is simpler, but still confirm per family — do not assume.
Do you guarantee landed cost in my country?
We can discuss terms (e.g. FOB) in writing. Duties and local inland are usually on the buyer unless agreed otherwise.
Related
Contact
KaimaLabel · pt.kaimafind.com · kaimazjw@gmail.com · WhatsApp via PL brief on the site
